tawa

TAWA NOVA Header

Tawa Khola Hydropower Project

Project Overview

The Tawa Khola Hydropower Project is a 7.1MW run-of-the-river scheme located in Eastern Nepal. The project utilizes the flow of the Tawa Khola to generate clean, renewable energy that is fed into the national grid.

Installed Capacity

7.1 MW

Design Flow

16.5 m³/s

Gross Head

XXX

Annual Generation

XX.XX GWh

Turbine & Electromechanical

Turbine Type

Pelton / Francis (TBD)

Number of Units

2 Units

Generator Voltage

6.3 kV

Project Inception

January 2020

Feasibility study and initial licensing.

PPA Signed

January 2020

Feasibility study and initial licensing.

Project Inception

January 2020

Feasibility study and initial licensing.

Project Inception

January 2020

Feasibility study and initial licensing.

Project Inception

January 2020

Feasibility study and initial licensing.

Transmission Content

Details about transmission go here.

Project Status

Civil Works

45%

Hydro-Mechanical

20%

Electro-Mechanical

10%

Transmission Line

5%