Project Overview
The Tawa Khola Hydropower Project is a 7.1MW run-of-the-river scheme located in Eastern Nepal. The project utilizes the flow of the Tawa Khola to generate clean, renewable energy that is fed into the national grid.
Installed Capacity
7.1 MW
Design Flow
16.5 m³/s
Gross Head
XXX
Annual Generation
XX.XX GWh
Turbine & Electromechanical
Turbine Type
Pelton / Francis (TBD)
Number of Units
2 Units
Generator Voltage
6.3 kV
Project Inception
January 2020
Feasibility study and initial licensing.
PPA Signed
January 2020
Feasibility study and initial licensing.
Project Inception
January 2020
Feasibility study and initial licensing.
Project Inception
January 2020
Feasibility study and initial licensing.
Project Inception
January 2020
Feasibility study and initial licensing.
Transmission Content
Details about transmission go here.
Project Status
Civil Works
45%
Hydro-Mechanical
20%
Electro-Mechanical
10%
Transmission Line
5%
Key Features
- Minimal Environmental Footprint
- Community Ownership Model
- Advanced Control System